We’re thrilled to share the photos of the completed Holy Spirit School classroom building. 📸

This new ≈ 4,200-square-foot single-story facility includes three spacious classrooms, one of which is a dedicated STEM room, along with outdoor STEM areas, restrooms, and a comfortable teacher’s lounge.

Our Kluger Architects team was involved every step of the way, from the earliest design concepts through to final details. We are excited for students and teachers to enjoy this facility, now that it’s completed.

Take a look at the photos of our finished space and visit our website for more photos:
🔗 https://lnkd.in/gpT99yGy

Thank you for everyone involved in the project:
– Structural Engineer: KPFF Consulting Engineers
– MEP: Kreative Engineering Inc.
– Civil Engineer: McGrath Civil, Inc.
– Landscape: Wilson Davis Associates
– Geotechnical Engineer: Geotechnical Solutions, Inc.
– Survey: Salazar Surveying
– Contractor: EPI Construction Inc
– Architect: Kluger Architects

Connect with us on LinkedIn and show your support!

Leave A Comment